ANSI/AWI 0620-2024 - Finish Carpentry/Installation
4.0 Figures/Illustrations
Figure 5 – Compliance Testing Measurement
Figure 6 – Gaps at Field Joints
Figure 7 – Flushness of Field Joints
Figure 8 – Scribe Filler
Figure 9 – Scribe Moulding
Figure 10 – Scribe Allowance
Figure 11 – Wall Mount Splash
Figure 12 – Countertop Mount Splash
Figure 13 – Panel Reveal
Figure 14 – Panel Flushness
Figure 17 – Laboratory Application Reveal
Figure 23 – Overlap
Figure 25 – Over-Filing / Over-Machining
Figure 30 – Gaps and Flushness, Casework
Figure 41 – Closure, Laminate
Figure 42 – Closure, Filler
Figure 43 – Gaps, Reveal Overlay Frameless
Figure 44 – Gaps, Flush Overlay Frameless
Figure 45 – Gaps, Reveal Overlay Face Frame
Figure 46 – Gaps, Inset Face Frame
Figure 51 – Gaps and Flushness, Wall and Ceiling Surfaces
Figure 52 – Gaps and Flushness, Countertops
Figure 53 – Gaps and Flushness, Standing and Running Trim