571-323-3636
ANSI/AWI 0620-2024 - Finish Carpentry/Installation
3.2 Material
a) shall confirm that all materials required for installation are available and properly conditioned to the jobsite per AWI 200 – Care & Storage (latest edition).
b) Furring and structural framing on wall/ceiling surface(s), shall be used as required and be in accordance with applicable codes and regulations.